LOS ANGELES · EST. 1932 Friday, November 20, 2026 · Pacific editionNewsroom
NUNTIA LIBERA
PER MUNDOS ET SAECULA
Los Angeles

Checking the weather…

Change locationLos Angeles

YOUR EDITION / ONE LOCATION

Make yourself at home

One choice sets your weather, local reporting and regional defaults across the Herald. You can refine each section afterward.

Use your approximate location for local news and weather?

Only Yes sends your IP address to IPWhois to find an approximate city. No keeps Los Angeles.

Search worldwide by city, state or country.

    Selected: Los Angeles.

    City search: Open-Meteo · GeoNames · CC BY 4.0

    MET NorwayCC BY 4.0

    The Aeon Herald / HERALD ORIGINAL

    Port Seeks a New Use for Its Landmark Municipal Warehouse

    The invitation for ideas begins a redevelopment process for Warehouse No. 1, rather than approving a design or choosing an operator.

    Unlocked by patron

    SAN PEDRO — The Port of Los Angeles is asking developers to propose a future for Municipal Warehouse No. 1, the 1917 building beside the Main Channel. The request for interest invites adaptive commercial and visitor-serving uses while retaining the property’s historic significance.

    The six-story building stands at Berth 60 in the Outer Harbor. The solicitation describes approximately 480,000 square feet of interior space and identifies possibilities including offices, hospitality, dining, education and marine-related activity. Those are suggested directions for proposals, not a list of tenants already selected.

    The port’s November 12 announcement sets March 10, 2025 as the response deadline. The information received is intended to shape later qualification and proposal stages. Environmental review and the obligations attached to the building’s historic status remain part of the work ahead.

    Warehouse No. 1 initially served as the port’s bonded warehouse. The port says portions remain in use and that the property is also used for screen production. It is listed in the National Register of Historic Places; a December 13 correction to the port’s release expressly removes an erroneous state-landmark designation.

    The practical question is how much of a building made for freight can serve a different public and commercial life. The present invitation opens that question. It does not yet answer who will pay for a conversion, what design will be approved or when a finished project will open.

    Sources & further reading

    HERALD ORIGINAL

    THE READING ROOM

    Discussion

    Conversations are reviewed by the newsroom before they appear. Your display name and approved comment are public.

    No published comments yet.

    Join the conversation

    No email address is requested. Please keep private information out of your comment.

    Choose what this browser remembers, whether analytics may load and which external widgets can load. Necessary sign-in and security cookies are controlled by your browser.

    Analytics is optional and off until allowed. Disabling analytics stops future loading and clears accessible analytics cookies. Disabling a preference clears its local data. Learning remains a separate opt-in in Your Interests. Disabling external widgets stops future loading; remove existing provider cookies through your browser.

    Read the Cookie Policy